Jobs Career Advice Signup
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

  • Posted: Oct 31, 2023
    Deadline: Nov 3, 2023
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • Never pay for any CBT, test or assessment as part of any recruitment process. When in doubt, contact us

    Peace Winds is a disaster preparedness, response and recovery organization. Peace Winds advocates for increased collaboration between governments, militaries, NGOs, and the private sector to prepare for and respond to natural disasters across the globe, with the Japan - U.S. relationship as the cornerstone of humanitarian assistance.
    Read more about this company

     

    Water Supply Engineering Consultant

     Scope of Work

    Desk Review and Field Data Collection

    During assignment the consultant will be required to undertake the following activities.

    • To undertake a desk review of the existing reports on water resources planning and water supply design
    • Undertake field work to understand the project context, and conduct interviews with key stakeholders at county, UNHCR and camp levels to update gaps in existing data
    • Update/ collect data with reference to the following information:
      • Population projections
      • Water demand forecasts
      • Urban planning and water supply
      • Infrastructure condition of existing water supply and distribution system
      • Current Water Service organization, revenue collection system and operation and maintenance

    Borehole survey and conduct hydrogeological evaluation of existing boreholes

    • Supervise borehole survey. The survey shall comprise pump-testing of existing 23 boreholes to determine hydraulic parameters of aquifer units and safe abstraction yields of boreholes. The scope of the survey shall include: A 3 hour calibration test conducted at maximum pump discharge to calculate the most suitable discharge rate for the constant discharge test, A constant discharge test, conducted at a discharge rate of 26.6 l/s over a 24 hour period and a recover test, where the water level recovery was measured to 97% of its original (pre pumping) level
    • Generate a hydrogeological evaluation report of existing boreholes including a model of groundwater under current and projected abstraction conditions

    NB. PWJ shall engage a contractor to undertake the borehole pump-testing activities.

    Update Existing Water Supply Masterplan

    • The consultant shall utilize the information from activities (a) and (b) above to update the existing water supply masterplan. Under the master plan the consultant shall propose priority interventions following guidelines on water infrastructure planning by the Ministry of Environment Water and Irrigation. Priority interventions shall be costed.

    Timelines for Deliverables

    • The timelines for the expected deliverables under this assignment are shown in the table below:

    Deliverable

    Format

    Timelines

    • Inception Report
    • Work plan as Gantt Chart
    • 0.5 Weeks after contract signing
    • Desk Review Report
    • Main Report & Executive Summary in MS Word + Hard copies (3), PPt Presentation,
    • MS Excel
    • Draft (1.5 weeks) & final (2 weeks) after contract signing
    • Borehole Survey and Hydrogeological Evaluation report & Draft Updated Masterplan
    • Main Report & Executive Summary in MS Word + Hard copies (3), PPt Presentation,
    • MS Excel
    • 6 Weeks after contract signing
    • Final Updated Masterplan report with priority works
    • Complete set of documents complying with applicable standards in MS Word, PDF as applicable
    • 8 weeks after contract signing

    Anticipated Level of Effort (LoE)

    • This assignment will require an estimated Level of Effort (LoE) of 48 person-days as broken down below:

    Activity

    Time Input (man-days)

    • Inception Report
    • 3
    • Desk Review Report
    • 10
    • Field Data Collection & Borehole Survey in Kakuma
    • 15
    • Draft and Final Reports (Updated Masterplan, Borehole Survey and Hydrogeological Evaluation)
    • 20

    Duration of the Assignment

    • It is anticipated that the assignment will take place over a period of 2 months (8 weeks) spread between November to December 2023.

    Necessary Consultant's Qualifications and Experience

    • The water supply engineering consultant shall comprise a team with an individual lead consultant (water supply engineer) and a hydrogeologist. The consultant shall be required to demonstrate experience of at least 15-20 years undertaking assignments of similar complexity and scope. In addition, the consultant must be personally available to undertake the work as and when required and will be accountable, for ensuring project deliverables.

    Consultant's Qualifications

    • The qualifications, skills and experience required in the water supply engineering consultant team shall be as follows:

    Lead Consultant (water supply engineer)

    • Lead consultant shall possess at the minimum a bachelor's degree in civil engineering, water engineering or related, with between 15 -20 years' relevant experience; Registered as a professional engineer with the EBK (provide CV and valid practice certificate)
    • Experience undertaking feasibility studies, detailed engineering designs for water supply interventions for at least 5 projects of similar nature and complexity
    • Technical skills in preparation of engineering reports

    Hydrogeologist

    • Hydrogeologist with a minimum of bachelor's degree in geology and masters in geology and 15-20 years relevant experience; Registered as a hydrogeologist by the Ministry of Environment, Water and Irrigation (provide CV and valid practice certificate)
    • Experience in conducting of groundwater assessment and modelling studies and borehole surveys on at least 5 projects of similar nature
    • Technical skills in preparation of engineering reports

    Technical Proposal

    The consultant’s technical proposal shall contain the following:

    • Understanding of assignment and planned approach
    • Work Plan with clear duties and responsibilities for each team member
    • Summary of Consultants experience in undertaking assignments of similar scope and/or complexity (last 5 years)
    • Qualifications and Experience of Consultant's team
    • Relevant practice certificates
    • Sample reports (2 each of engineering studies and borehole survey/ groundwater assessments of similar nature)
    • Detailed CVs indicating a minimum of 3 references from reputable organizations that the consultant has worked with over the past 5 years clearly indicating description of assignment, date/s of execution, name of organization and details of contact person (e-mail and telephone contact)

    Note: The consultant's technical proposal shall not exceed 5 pages. This excludes any annexes.

    Financial Proposal

    • The consultant’s financial costing to undertake the assignment will be provided as part of the proposal and should cover all costs associated with execution of the planned activities, including professional fees and any other related expenses.
    • The consultant will utilize the following budget template for their financial proposal:

    Description

    Unit

    Qty

    Rate (KSh)

    Amount (KSh)

    • Consultants professional Fees
    • man-days
    • Airport transfer costs
    • trips
    • Communication costs
    • LS
    • Taxes (indicate relevant tax)%

    Total

    Support to be provided by the client

    PWJ shall facilitate the consultant with the following support while undertaking the assignment:

    • Flight Travel (Nairobi – Kakuma)
    • Provision of Transport to the consultant's team while working in the field
    • Provision of Meeting venue/s and/or desk space while in the field
    • Accommodation while in the field

    Scoring of Technical Proposal

    The technical proposal shall be evaluated against a total mark of 80% with pass mark of 60%.

    Criteria

    Assessment

    Total Score (%)

    Demonstrates clear understanding of the terms of reference

    • excellent understanding ToR = 8 – 10
    • some gaps in understanding of ToR = 5 – 7
    • poor demonstration of understanding ToR <5
    • 10

    Clear methodology and approach to assignment

    • clear and detailed methodology which includes all critical aspects and comprehensive approach to assignment = 12 – 20
    • clear methodology but missing some details which are not critical to assignment = 8 – 12
    • methodology missing critical aspects < 8
    • 20

    Experience in undertaking assignments of similar scope and/or complexity (last 10 years)

    • Experience in 5 or more relevant assignment of similar complexity/ more advanced nature (over the last 10 years) = 12 – 20
    • Experience in at least 3 relevant assignments of similar complexity/more advanced nature (over the last 10 years) = 8 – 12
    • Experience in 2 or less relevant assignment of similar complexity/more advanced nature / not adequate (over the last 10 years) < 8
    • 20

    Experience and Qualifications of Lead Consultant (CV & practice certificate attached)

    • The Lead consultant meets the academic requirements with at least 15 years of relevant experience and 10 years or more conducting similar assignments = 8-12
    • The Lead consultant meets the academic requirements with at least 10 years of relevant experience and 5 years conducting similar assignments = 5-7
    • The Lead consultant meets the academic requirements with at least 8 years of relevant experience and 3 years conducting similar assignments <5
    • 12

    Experience and Qualifications of Hydrogeologist (CV & practice certificate attached)

    • Hydrogeologist meets the academic requirements with at least 15 years of relevant experience and 5 years or more conducting similar assignments = 3-5
    • Hydrogeologist meets the academic requirements with at least 10 years of relevant experience and 5 years conducting similar assignments = 2
    • Hydrogeologist meets the academic requirements with at least 10 years of relevant experience and 5 years conducting similar assignments <1
    • 5

    Realistic work plan attached

    • Detailed and comprehensive work plan which captures all the key activities = 4-5
    • Work plan misses some of the activities = 2-3
    • Work plan missing critical aspects or not included <2
    • 5

    Minimum of 4 Reports Provided

    • Minimum of 4 acceptable reports (2 engineering, 2 hydrogeological) provided as required =5
    • 2 - 3 reports provided = 3
    • Only 1 report provided or none = 0
    • 5

    CV and Practice Certificates Attached

    • CV and practice certificates attached for each consultant = 3
    • CV and practice certificates not provided = 0
    • 3

    Scoring of financial proposal

    • The financial proposal for each bidder meeting the required pass mark for the technical evaluation shall be evaluated against a total score of 20% weighted using the following formula:
    • financial score = lowest priced passing bid/ price of other bid *20%

    Computation of Total Score for evaluated Bids

    • Total score shall be computed by summing up the technical scores and the weighted financial scores.
    • total score = technical score of bidder + weighted financial score

    Determination of Award

    • Award shall be made to the bidder with the highest evaluated total score as computed above.

    Validity of Bid

    • Bidders shall clearly indicate that their bid is valid for a period of not less than 30 days from the date of submission.

    Proposal Submission

    • The Technical & Financial Proposal shall be submitted comprising (a) Letter of submission duly signed by authorized bidder representative, (b) Main Technical & Financial Proposal document in PDF format, (c) Attachments to Technical Proposal in PDF (4 Sample Reports, CVs, Degree certificate, Practice license/s).

    All submissions should be made to tenders@peace-winds.or.ke on or before 1 November 2023 at 3:00PM EAT.

    Method of Application

    Send your application to  tenders@peace-winds.or.ke

    Build your CV for free. Download in different templates.

  • Apply Now
  • Send your application

    View All Vacancies at Peace Winds Japan Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
Send your application through

GmailGmail YahoomailYahoomail